Sponsored Links
-->

Friday, March 2, 2018

Hoover Dam (Ohio) - Wikipedia
src: upload.wikimedia.org

Hoover Dam, in Blendon Township, near Westerville, Ohio, dams the Big Walnut Creek to form the Hoover Memorial Reservoir. This reservoir is a major water source for the city of Columbus, Ohio. It holds 20.8 billion US gallons (79,000,000 m3) of water and has a surface area of 3,272 acres (13.24 km2), or about five square miles. Construction began during 1953 due to the increased water demand of post-war Columbus. The project was completed and dedicated in 1955 and the dam officially opened in 1958. It was named for two brothers, Charles P. Hoover and Clarence B. Hoover, to honor their careers with the City of Columbus Waterworks.


Video Hoover Dam (Ohio)



Construction statistics

  • Quantity of concrete: approximately 180,000 cubic yards (140,000 m3)
  • Quantity of earth fill: approximately 600,000 cubic yards (460,000 m3)
  • Length of spillway: 680 feet (210 m)
  • Length of dam: 2,583 feet (787 m)
  • Maximum height of dam: approximately 94 feet (29 m) above stream bed
  • Uncontrolled spillway elevation: 890 feet (270 m) mean sea level
  • Top of dam elevation: 911 feet (278 m) mean sea level

Maps Hoover Dam (Ohio)



Gallery


HilliardsHappening - City of Hilliard Blog
src: blog.hilliardohio.gov


References


Saugeye and Buffalo Carp Fishing at Hoover Dam - YouTube
src: i.ytimg.com


External links

  • Kayak Hoover Dam - a semi-informative treatise on the wonders of kayaking at the Central Ohio Reservoir, complete with pictures and interactive maps leading to boat ramps.
  • GoFishOhio.com - information about fishing at Hoover Reservoir
  • Ohio DNR fishing map of Hoover Reservoir


Source of article : Wikipedia